Warning

JUser: :_load: Unable to load user with ID: 67

Subscribe to this list via RSS Blog posts tagged in slurry

Astro Update as at 12 June 2015

Posted by on in News

Last week we:

  • Started digging the trenches for the team shelter
  • Prepared the surface bed for the slurry layer
  • Continued working on the Terraforce
  • Continued preparing the paved areas and curbs

This week we:

  • Created the steps onto the playing area
  • Laid the foundations for the team shelter
  • Prepared the holes for the fence poles
  • Started and are hoping to complete the slurry layer before the rain predicted for next week
  • Started working on the change rooms

b2ap3_thumbnail_12-June-2015-Preparing-for-paving.jpg

Preparing for the paving.

b2ap3_thumbnail_12-June-Holes-for-fence-poles.jpg

Holes for fence poles.

b2ap3_thumbnail_12-June-2015-the-first-strip-of-slurry.jpg

The first strip of slurry.

b2ap3_thumbnail_12-JUNE-2015-DRAINAGE.jpg

Drainage.

 

b2ap3_thumbnail_12-June-Starting-with-the-team-shelter.jpg

Starting with the team shelter.

b2ap3_thumbnail_12-June-Slurry-layer.jpg

Slurry layer.

Astro Update: 22 May 2015

Posted by on in News

Progress this week: 

b2ap3_thumbnail_Constructing-mole-barrier.jpg

Installing the mole barriers.

 

b2ap3_thumbnail_Preparing-the-surface-for-the-slurry.jpg

Preparing the surface for the slurry.

 

b2ap3_thumbnail_Bases-for-the-lights.jpg

Getting ready to pour the bases for the lights.