PHS Astro Update as at 4 May 2015
To date we have:
- Built the new spectator berm and replanted the grass on it
- Raised the playing surface with clean sand to the required height and slope.
- Levelled and compacted about 75% of the base layer.
This week we will:
- Finish off the base layer.
- Install the sub base system (for drainage).
- Import and install curbs.