Warning

JUser: :_load: Unable to load user with ID: 67

Posted by on in News
  • Font size: Larger Smaller
  • Hits: 4505
  • Print

PHS Astro Update as at 4 May 2015

To date we have:

  • Built the new spectator berm and replanted the grass on it
  • Raised the playing surface with clean sand to the required height and slope.
  • Levelled and compacted about 75% of the base layer.

This week we will:

  • Finish off the base layer.
  • Install the sub base system (for drainage).
  • Import and install curbs.

 

  • b2ap3_thumbnail_Astro--update-collage-4-May-2015.jpg
Tagged in: astro