Warning

JUser: :_load: Unable to load user with ID: 67

Posted by on in News
  • Font size: Larger Smaller
  • Hits: 3061
  • Print

Astro Update as at 13 May 2015

Last week we:

  • completed the importing of material and compacting the base layer.
  • moved most of the heavy machinery off-site.
  • started with the subsoil drainage system.
  • completed the compaction and replanting of the berm.

 

This week we:

  • will finish off the subsoil system.
  • started to install the kerbs in preparation for the slurry layer which will seal off the surface.

 Construction on the mole barrier and retaining walls will also start soon.

 

b2ap3_thumbnail_Astro.jpg